Robotics - RCM/ONB - Initiate ONB (#5)
Pre-Requisites
- Within Recruiting - ensure that any data required to map from RCM to ONB has been completed (Offer details, start date etc)
- Move candidate into the applicant pipeline step where ONB can be initiated
Step 1: Open the Candidate Config Worksheet
- Create your new Iteration & prepare sheet (if not already done so) (Robotics - Prepare Workbook)
- Open the workbook and navigate to the Candidate Config Sheet, which is divided into two sections:
- **Left-hand side (LHS): **Use this section if you want to Initiate Onboarding from a Req and then execute NHDR
- **Right-hand side (RHS): **Use this section if you want to Add a Candidate to Onboarding and hire with a Position ID
- Enter the required data in the appropriate sections - include Column L as Yes (only if you need to generate fake data).
• Use Column L = Yes when you want the system to generate fake NHDR data for testing.
• The fake data will not match the candidate or requisition.
• Mapped fields from RCM → ONB (like address & phone) will first appear with the real candidate data in ONB and EC.
• If you use the fake NHDR data via the Bot, it will overwrite those real mapped values.
• To keep testing clean, update the NHDR name (and any key fields) so it matches your real candidate before completing NHDR.** **
Left Hand Side (Initiate ONB from Req)
Close the workbook and run the second prepare 
Updated on: 15/04/2026
Thank you!